Decking Built for March Point's Specific Conditions
March Point sits close enough to the water that homes here deal with a different set of conditions than a deck going in further inland in Skagit County. Salt-laden air off the bay, driving rain that comes in sideways during fall and winter storms, and a moss and algae season that can run half the year all put real stress on outdoor living spaces. A deck built to a generic spec sheet without accounting for this environment tends to show problems early — soft spots at the ledger, green film on walking surfaces, corroded hardware, or boards that cup and gap faster than the warranty paperwork implies.
Composite decking, installed correctly for this climate, holds up far better than most alternatives. But "composite decking" covers a wide range of products and installation approaches, and the difference between a deck that looks good for two years and one that performs for two decades usually comes down to details most homeowners never see: substructure spacing, flashing at the house, fastener selection, and drainage planning underneath the boards.

What Correct Composite Decking Installation Actually Involves
The Substructure Matters More Than the Boards
Composite decking is only as good as what it's fastened to. In a wet marine climate, joists and beams need pressure-treated lumber rated for ground contact where applicable, joist tape or a capillary break to keep moisture out of fastener penetrations, and spacing that matches the manufacturer's spec for the specific board profile being used — not a generic 16-inch layout applied to every job. Composite boards flex and expand differently than wood, and undersized joist spacing is one of the most common causes of bounce, sag, and premature fastener failure we see on decks that weren't built for this material specifically.
Ledger Attachment and Flashing
Where a deck attaches to the house is the single most important detail on the entire structure, and it's also the detail most likely to be rushed. Proper ledger flashing — installed so water is directed out and away from the wall assembly, not just caulked and hoped for — is non-negotiable in an area that sees the volume of driving rain Anacortes gets. A poorly flashed ledger doesn't fail the day it's installed; it fails two or three winters later, and by then the damage is often inside the wall, not just at the deck.
Fasteners and Hardware
Salt air accelerates corrosion on standard hardware. Structural connectors, ledger bolts, and joist hangers should be stainless steel or a coating rated for coastal exposure, not the cheapest galvanized option on the shelf. Hidden fastener systems for the decking surface itself should also be matched to the specific board — composite boards vary in groove profile, and using the wrong clip system is a common source of squeaks, loosening, and uneven board spacing over time.
Choosing the Right Composite Board for a Bay-Adjacent Climate
Not all composite decking is built the same way, and the differences matter more here than they would in a dry climate. The table below breaks down the main categories homeowners in this area typically choose between.
| Decking Type | Moisture Behavior | Moss/Algae Resistance | Typical Upkeep |
|---|---|---|---|
| Capped composite (composite core with a protective outer shell) | Very low water absorption; core is shielded from direct moisture contact | Good — smooth capped surface sheds spores more easily than open-cell material | Occasional wash; no staining or sealing |
| Uncapped composite | Higher water absorption at the surface over time | Fair — more prone to surface staining and moss anchoring in humid, shaded areas | Periodic cleaning with a composite-safe cleaner |
| Pressure-treated wood | Absorbs and releases moisture constantly; prone to swelling, checking, and warping | Poor — organic surface is a natural moss and algae host | Annual sanding, staining, or sealing |
| PVC decking (no wood fiber content) | Essentially impervious to moisture | Very good — nothing organic in the material for growth to anchor to | Occasional wash; higher material cost |
For most March Point homes, capped composite hits the right balance of upfront cost, long-term maintenance, and performance against moss and moisture. We install capped composite boards from established manufacturers rather than uncapped or off-brand product, because the outer shell is what actually does the work of keeping salt air and standing moisture away from the core material over the life of the deck.
Color and Board Selection Considerations
Darker composite boards absorb more heat, which can be pleasant on a cool Skagit County evening but also accelerates any surface expansion at board ends if gapping wasn't set correctly during install. Lighter and mid-tone colors tend to show less contrast if any pollen, moss spore, or salt residue settles on the surface between cleanings — a minor point, but one worth discussing before finalizing a color choice for a deck that will sit close to open water and tree cover.
Moss, Algae, and Drainage: Designing a Deck That Sheds Water
Moss doesn't grow on decking because the material is defective — it grows because moisture and organic debris are sitting somewhere long enough to let it establish. Good deck design fights this at the structural level, not just with surface cleaning:
- Board spacing set correctly for drainage and for the specific composite product's expansion rate
- Joist layout that avoids low spots where water and debris can pool underneath the deck
- Picture-frame or border boards installed with attention to end-grain sealing at cut edges
- Under-deck airflow preserved rather than boxed in tightly, so the substructure can dry out between storms
- Gutters or drip edges positioned so roof runoff isn't dumping directly onto the deck surface
Shaded areas under large evergreens common to this part of Skagit County are worth flagging during the design phase — a deck section that stays damp and shaded most of the day will need a slightly different drainage and cleaning plan than one in full sun.
Our Installation Process
- On-site assessment of the attachment point, grade, drainage path, and existing structure (if replacing an old deck)
- Confirming board selection, color, and layout based on sun exposure, shade patterns, and how the space will actually be used
- Structural plan covering joist spacing, footing depth, and ledger flashing detail specific to the home
- Permit filing where required for the scope of work
- Demolition and disposal of the old structure, if applicable
- Framing, flashing, and structural inspection before any decking goes down
- Composite board installation with manufacturer-specified fastener systems
- Final walkthrough covering maintenance expectations and warranty paperwork
Maintenance Expectations for Composite Decking Here
Composite decking is lower-maintenance than wood, but "low-maintenance" doesn't mean "no maintenance," especially with a real moss season to plan around. A simple seasonal routine keeps a properly installed deck performing for its full expected lifespan:
- Sweep debris — leaves, needles, pollen — off the surface regularly rather than letting it sit through wet weeks
- Rinse the deck a few times a year with a hose and a soft-bristle broom; pressure wash only at low PSI and per manufacturer guidance
- Use a composite-safe cleaner for any moss or algae film rather than harsh chemicals that can dull the cap layer
- Check under-deck airflow paths annually to make sure planters, storage, or added skirting haven't blocked ventilation
- Inspect ledger flashing and fastener points once a year, particularly after the first heavy storms of the season
Permits and Local Considerations
Deck projects in and around Anacortes typically require a building permit once the structure exceeds a certain height or size, and homes closer to the water may have additional setback or critical-area considerations depending on proximity to the shoreline. We handle permit filing as part of the project scope so homeowners aren't left navigating Skagit County or City of Anacortes requirements on their own. Every property is slightly different, which is exactly why a site visit — not a phone estimate — is the right way to scope a deck project in this area.
Why Hire a Crew That Already Works in March Point
A contractor who only occasionally works this close to the water can miss things that aren't obvious until a few winters in — how much salt exposure a west-facing deck actually gets, which shaded corners need extra drainage attention, or how quickly moss re-establishes on a poorly ventilated substructure. We've built and repaired decks throughout the Anacortes area long enough to know which details matter here and which generic installation shortcuts simply don't hold up. That local pattern recognition is worth more than any single product spec sheet.
If you're planning a new composite deck or replacing an aging one in March Point, we're happy to take a look and put together a straightforward, no-pressure estimate — just fill out the form below and we'll go from there.
Anacortes Siding